- Home
- RERA Projects
- Gurugram
- Godrej Nature Plus Phase-1
18 OF 2018
RERA overview
As filed by the promoter in Form REP-I with HRERA Gurugram.
- businessPromoter
- Godrej Highview LLP
- placeLocation
- Sector-33, Sohna
- mapTehsil / District
- Sohna, Gurugram
- verifiedRERA status
- Extension certificate uploaded
- account_balanceAuthority
- HRERA Gurugram
- edit_calendarApplied on
- 30 Nov 2019
- architectureLayout plan approved
- 11 Nov 2014
- constructionConstruction start
- 01 Mar 2018
- event_availableCompletion date
- 30 Jan 2028
- workspace_premiumRegistration valid
- 30 Jan 2018 – 30 Jan 2028
- layersFAR (permissible / proposed)
- 175 / 174.93
- paymentsEstimated project cost
- ₹ 325.3 Cr
Licence
Land use 15.6 acres in all
Estimated cost ₹ 325.3 Cr in all
Promoter
- Company
- Godrej Highview LLP
Book a free site visit
Latest price, offers and a guided visit of Godrej Nature Plus Phase-1.
Mr Prashant Agarwal is available to discuss all your queries.
Online now · replies on WhatsApp
Quick questions
Plot sizes
1 sizes · 0 plots registered with RERA. Tap a column to sort.
| Sq yd | Sq ft | Sq m | Plots |
|---|---|---|---|
| 0 | 0 | 0 | 0 |
Areas are as registered with RERA (square metres); square yards and square feet are converted. Final sizes are as per the allotment.
Unit types
754 units in 1 types as registered with RERA.
| Type | Carpet area (sq ft) | Units |
|---|---|---|
| Apartment/Shops/Other Buildings | 823 – 1,159 | 754 |
Carpet areas as filed with RERA (square metres, shown in square feet). Booked / unsold are as on the RERA application date.
Facilities & services
11 facilities in the promoter's service plan estimate · ₹ 25.75 Cr budgeted.
-
add_road
Internal Roads and Pavements ₹ 5.48 Cr est.
-
water_drop
Water Supply System ₹ 33.05 L est.
-
water
Storm Water Drainage ₹ 79.86 L est.
-
bolt
Electricity Supply System ₹ 3.14 Cr est.
-
recycling
Sewage Treatment & Garbage Disposal ₹ 79.86 L est.
-
light
Street Lighting ₹ 84.35 L est.
-
local_fire_department
Security and Fire Fighting ₹ 31.43 L est.
-
park
Playgrounds and Parks ₹ 2.77 Cr est.
-
people
Club House / Community Centre ₹ 9.66 Cr est.
-
store
Shopping Area ₹ 0.84 L est.
-
wb_sunny
Renewable Energy System ₹ 27.27 L est.
Also budgeted Any Other · ₹ 1.34 Cr
Not in this filing School Hospital / Dispensary
External connections
- check_circleRoads HUDA/GMDA
- check_circleWater Supply HUDA/GMDA
- check_circleElectricity DHBVN
- check_circleSewage Disposal HUDA/GMDA
- check_circleStorm Water Drainage HUDA/GMDA
Specifications
- Flooring Details of Various Parts of House
- LIVING ROOM & DINING ROOM-VITRIFIED TILES BED ROOMS-LAMINATED WOODEN FLOOR TOILETS WITH BEDROOMS-ANTI SKID CERAMIC TILE KITCHEN-ANTI SKID TILES BALCONY-ANTI SKID TILES UTILITY ROOM-CERAMIC TILES
- Wall Finishing Details
- LIVING ROOM & DINING ROOM-ACRYLIC EMULSION BEDROOMS-ACRYLIC EMULSION TOILETS WITH BEDROOMS-TILL 7'-0" ON ALL SIDES KITCHEN-CERAMIC TILES 2'-0" ABOVE COUNTER. UTILITY ROOM-ACRYLIC EMULSION
- Kitchen Details
- FLOORS-ANTI SKID TILES EXTERNAL DOORS & WINDOWS-ANODIZED/POWDER COATED ALUMINUM INTERNAL WALLS-CERAMIC TILES 2'-0" ABOVE COUNTER. FIXTURES AND FITTINGS-MARBLE / GRANITE TOP WITH STAINLESS STEEL SINK WITH DRAIN BOARD
- Bathroom Fittings
- ALL PROVIDED OF STANDARD COMPANY MAKE
- Wood Work Etc
- N/A
- Doors and Windos Frames
- POWDER COATED ALUMINUM
- Glass Work
- YES
- Electric Fittings
- MEP
- Conducting and Wiring Details
- MEP
- Cupboard Details
- N/A
- Water Storage
- MEP
- Lift Details
- YES
- External Glazings
- YES
- Windows / Glazings
- POWDER COATED ALUMINUM
- Doors
- POWDER COATED ALUMINUM
- Main Doors
- VENEER FINISH FLUSH DOORS/MOULDED SHUTTER WITH HARDWOOD FRAME
- Internal Doors
- LAMINATED FLUSH DOORS/MOULDED SHUTTERS WITH HARDWOOD FRAMES
- Air Conditioning
- MEP
- Electrical Fittings
- MEP
- Cng Pipe Line
- MEP
- Provision of Wifi and Broadband Facility
- MEP
- External Finishing / Colour Scheme
- EXTERIOR GRADE PAINT
- Internal Finishing
- ACRYLIC EMULSION
- Floor
- VITRIFIED TILES
- Walls
- ACRYLIC EMULSION
- Ceiling
- OIL BOUND DISTEMPER
- Floor
- LAMINATED WOODEN FLOOR
- Walls
- ACRYLIC EMULSION
- Ceiling
- OIL BOUND DISTEMPER
- Modular Wardrobes
- N/A
- Floor
- ANTI SKID CERAMIC TILE
- Walls
- TILL 7'-0" ON ALL SIDES & ACRYLIC EMULSION
- Ceiling
- GRID CEILING
- Counters
- YES
- Sanitary Ware / Cp Fittings
- ALL PROVIDED OF STANDARD COMPANY MAKE
- Fitting / Fixtures
- ALL PROVIDED OF STANDARD COMPANY MAKE
- Floor
- LAMINATED WOODEN FLOOR
- Walls
- ACRYLIC EMULSION
- Ceiling
- OIL BOUND DISTEMPER
- Wardrobes
- N/A
- Floor
- ANTI SKID CERAMIC TILE
- Walls
- TILL 7'-0" ON ALL SIDES & ACRYLIC EMULSION
- Ceiling
- OIL BOUND DISTEMPER
- Counters
- YES
- Sanitary Ware / Cp Fittings
- ALL PROVIDED OF STANDARD COMPANY MAKE
- Fixtures
- ALL PROVIDED OF STANDARD COMPANY MAKE
- Floor
- ANTI SKID TILES
- Walls
- CERAMIC TILES 2'-0" ABOVE COUNTER & ACRYLIC EMULSION
- Ceiling
- OIL BOUND DISTEMPER
- Counters
- MARBLE / GRANITE TOP
- Fixtures
- ALL PROVIDED OF STANDARD COMPANY MAKE
- Kitchen Appliances
- STAINLESS STEEL SINK WITH DRAIN BOARD
- Floor
- CERAMIC TILES
- Walls & Ceiling
- ACRYLIC EMULSION & OIL BOUND DISTEMPER
- Toilet
- ANTI SKID CERAMIC TILE
- Balcony
- ANTI SKID TILES
- Floor
- ANTI SKID TILES
- Walls & Ceiling
- OIL BOUND DISTEMPER
- Railings
- MS RAILING AS PER DESIGN
- Fixtures
- ALL PROVIDED OF STANDARD COMPANY MAKE
Statutory approvals
Approvals declared in Form REP-I Part E.
- verified License Obtained
- verified License Renewal Obtained
- verified Zoning Plan Obtained
- verified Building Plan Obtained
- verified Environment Clearance Obtained
- verified Fire Scheme Approval Obtained
Plans filed with RERA
- check_circleLayout plan
- check_circleDemarcation plan
- check_circleZoning plan
- check_circleBuilding plan
- check_circleSite plan
- check_circleFloor plan
- check_circleApartment plans
- check_circleElevation section
- check_circleDetail of permissible FAR
- check_circleDetail of covered area achieved FAR
- check_circleRoads and pavement plan
- check_circleElectricity supply plan
- check_circleWater supply plan
- check_circleSewerage and garbage disposal plan
- check_circleStorm water drainage
- check_circleStreet lighting plan
- check_circleParking plan
RERA documents
53 documents downloaded from the HRERA portal. Opens as PDF.
Plans & layouts
Licence & approvals
CA certificates
Other documents
Development schedule
Planned spend each year, from the promoter's quarterly schedule.
Completion committed to RERA: 30 Jan 2028.
Godrej Nature Plus Phase-1
Share your details and our expert will call you back.
- check_circle Free site visit
- check_circle Best price assistance
- check_circle Home loan help