Sh. Sumeet, Engineering Officer and Ms. Asha, Chartered Accountant briefed about the facts of the project. Ms. Anjana Gulati, Sh. Gautam Babbar and Sh. Ranjit Bhambhu are present on behalf of the promoter. The AR of the promoter submits the clarification for road access permission issued by DTP, Gurugram dated 08.08.2025 wherein it is submitted that the Group Housing Site (GH-21) is approachable from existing revenue rasta (proposed to be widened upto 18 mt wide road from its existing width) as per layout plan of Sector-52A & 53, Gurugram bearing drawing no. DTP(G) 2200/2014 dated 05.06.2014. Further, as on date the 18 mt wide road is constructed upto project site. Further the promoter states that they will submit the DD of Rs 25 lakh each as a security amount for submission of approved environment clearance and fire scheme approval within four months from the issuance of registration certificate. Approved as proposed. The Registration Certificate shall be issued upon submission of the corrected Forms A to H, DPI, and compliance with other requirements as mentioned above.
- Home
- RERA Projects
- Gurugram
- Godrej Sora
GGM/976/708/2025/79
RERA overview
As filed by the promoter in Form REP-I with HRERA Gurugram.
- businessPromoter
- Godrej Properties Limited
- placeLocation
- GH-21, Urban Estate II, Sector 53, Gurugram
- mapTehsil / District
- Wazirabad St, Gurugram
- verifiedRERA status
- Approved and certificate uploaded
- account_balanceAuthority
- HRERA Gurugram
- edit_calendarApplied on
- 08 Jul 2025
- architectureLayout plan approved
- 01 May 2025
- constructionConstruction start
- 01 Aug 2025
- event_availableCompletion date
- 30 Sep 2032
- workspace_premiumRegistration valid
- 25 Aug 2025 – 30 Sep 2032
- layersFAR (permissible / proposed)
- 4.12 / 4.1
- paymentsEstimated project cost
- ₹ 1,570.18 Cr
Licence
Land use 3.6 acres in all
Estimated cost ₹ 1,570.18 Cr in all
Promoter
- Company
- Godrej Properties Limited
- Registered office
- 3rd Floor, Um House, Sector 44, Gurugram-122002
- CIN
- L74120MH1985PLC035308
Book a free site visit
Latest price, offers and a guided visit of Godrej Sora.
Mr Prashant Agarwal is available to discuss all your queries.
Online now · replies on WhatsApp
Quick questions
Plot sizes
1 sizes · 0 plots registered with RERA. Tap a column to sort.
| Sq yd | Sq ft | Sq m | Plots |
|---|---|---|---|
| 0 | 0 | 0 | 0 |
Areas are as registered with RERA (square metres); square yards and square feet are converted. Final sizes are as per the allotment.
Unit types
248 units in 1 types as registered with RERA.
| Type | Carpet area (sq ft) | Units |
|---|---|---|
| Apartment/Shops/Other Buildings | 133 – 3,412 | 248 |
Carpet areas as filed with RERA (square metres, shown in square feet). Booked / unsold are as on the RERA application date.
Facilities & services
18 facilities in the promoter's service plan estimate · ₹ 61.41 Cr budgeted.
-
add_road
Internal Roads and Pavements ₹ 2.33 Cr est.
-
water_drop
Water Supply System ₹ 11.5 L est.
-
water
Storm Water Drainage ₹ 29.57 L est.
-
bolt
Electricity Supply System ₹ 2.11 Cr est.
-
recycling
Sewage Treatment & Garbage Disposal ₹ 29.57 L est.
-
light
Street Lighting ₹ 49.28 L est.
-
local_fire_department
Security and Fire Fighting ₹ 32.03 L est.
-
people
Club House / Community Centre ₹ 38.99 Cr est.
-
store
Shopping Area ₹ 2.47 Cr est.
-
wb_sunny
Renewable Energy System ₹ 23.33 L est.
-
local_parking
Parking ₹ 66.55 L est.
-
recycling
Sewage Treatment Plant (STP) ₹ 39.93 L est.
-
water_drop
Underground Water Tank ₹ 16.42 L est.
-
water_drop
Rainwater Harvesting ₹ 1.81 Cr est.
-
nature
Softscape ₹ 2.58 Cr est.
-
nature
Hardscape ₹ 49.91 L est.
-
bolt
Electrical Substation ₹ 6.65 Cr est.
-
check_circle
Signanges ₹ 99.16 L est.
Not in this filing Playgrounds and Parks School Hospital / Dispensary
External connections
- radio_button_uncheckedRoads MCG
- check_circleWater Supply MCG
- check_circleElectricity DHBVN
- check_circleSewage Disposal GMDA
- check_circleStorm Water Drainage GMDA
Specifications
- Flooring Details of Various Parts of House
- VITRIFIED TILING/LAMINATED WOODEN FLOORING/SKID RESISTANT VITRIFIED TILES/WOODEN LOOK SKID RESISTANT TILES
- Wall Finishing Details
- ACRYLIC EMULSION PAINT/OIL BOUND DISTEMPER
- Kitchen Details
- FLOOR: VITRIFIED TILES, WALL: TILE CLADDING 2' ABOVE COUNTER AND OIL BOUND DISTEMPER ABOVE THAT, CEILING: OIL BOUND DISTEMPER
- Bathroom Fittings
- SANITARY FIXTURES & FITTINGS OF REPUTE MAKE
- Wood Work Etc
- LAMINATED/PAINTED FLUSH DOORS/ MOULDED SHUTTER WITH WOODEN FRAME
- Doors and Windos Frames
- MAIN DOOR: DESIGNER DOOR SHUTTER WITH VENEER FINISH INTERNAL DOORS: LAMINATED DOOR SHUTTER EXTERNAL DOOR & WINDOWS: GLAZED WINDOWS ALUMINUM/ UPVC/MS FRAME
- Glass Work
- 4MM AND ABOVE AS PER SPECIFICATIONS
- Electric Fittings
- AS PER BUILDING NORMS
- Conducting and Wiring Details
- AS PER BUILDING NORMS
- Water Storage
- UNDERGROUND AND OVERHEAD WATER TANKS
- Lift Details
- 3 PASSENGER LIFTS AND 1 SERVICE LIFT
- Windows / Glazings
- POWDER COATED/PAINTED ALUMINUM/UPVC WINDOWS WITH 4MM OR ABOVE THICK GLAZING AS PER SPECIFICATIONS
- Doors
- LAMINATED/PAINTED FLUSH DOORS/ MOULDED SHUTTER WITH WOODEN FRAME
- Main Doors
- LAMINATED/PAINTED/POLISHED FLUSH DOORS/ MOULDED SHUTTER WITH WOODEN FRAME
- Internal Doors
- LAMINATED/PAINTED FLUSH DOORS/ MOULDED SHUTTER WITH WOODEN FRAME
- Air Conditioning
- AS PER SPECIFICATION OF STANDARD MAKE
- Electrical Fittings
- AS PER SPECIFICATION OF STANDARD MAKE
- External Finishing / Colour Scheme
- EXTERNAL GRADE PAINTS
- Internal Finishing
- 10 TO 12MM THICK PLASTER ON BLOCKWORKS, RCC WALLS AND COLUMNS WITH CEMENT MORTAR OF 1:5
- Floor
- VITRIFIED TILES/ IMPORTED MARBLE
- Walls
- ACRYLIC EMULSION PAINT
- Ceiling
- OIL BOUND DISTEMPER
- Floor
- LAMINATED WOODEN FLOORING
- Walls
- ACRYLIC EMULSION PAINT
- Ceiling
- OIL BOUND DISTEMPER
- Floor
- SKID RESISTANT VITRIFIED TILES
- Walls
- TILE CLADDING UP TO FALSE CEILING ON ALL SIDES
- Ceiling
- GRID CEILING
- Counters
- GRANITE COUNTER
- Sanitary Ware / Cp Fittings
- GROHE OR EQUIVALENT SANITARY FIXTURES & FITTINGS
- Floor
- LAMINATED WOODEN FLOORING
- Walls
- ACRYLIC EMULSION PAINT
- Ceiling
- OIL BOUND DISTEMPER
- Floor
- SKID RESISTANT VITRIFIED TILES
- Walls
- TILE CLADDING UP TO GRID CEILING ON ALL SIDES
- Ceiling
- GRID CEILING
- Counters
- GRANITE COUNTER GLASS SHOWER PARTITION
- Sanitary Ware / Cp Fittings
- GROHE OR EQUIVALENT SANITARY FIXTURES & FITTINGS
- Floor
- VITRIFIED TILES/ IMPORTED MARBLE
- Walls
- TILE CLADDING 2' ABOVE COUNTER AND OIL BOUND DISTEMPER ABOVE THAT
- Ceiling
- OIL BOUND DISTEMPER
- Counters
- GRANITE WITH STAINLESS STEEL SINK
- Fixtures
- GROHE OR EQUIVALENT FIXTURES & FITTINGS
- Kitchen Appliances
- MODULAR KITCHEN WITH HOB & CHIMNEY
- Floor
- TILES
- Walls & Ceiling
- ACRYLIC EMULSION/OIL BOUND DISTEMPER
- Toilet
- OIL BOUND DISTEMPER
Statutory approvals
Approvals declared in Form REP-I Part E.
- verified Building Plan Obtained
- verified Allotment Letter Obtained
- verified Possession Certificate Obtained
- verified Zoning Obtained
- verified Conveyance Deed Obtained
Plans filed with RERA
- check_circleLayout plan
- radio_button_uncheckedDemarcation plan
- check_circleZoning plan
- check_circleBuilding plan
- check_circleSite plan
- check_circleFloor plan
- check_circleApartment plans
- check_circleElevation section
- check_circleDetail of permissible FAR
- check_circleDetail of covered area achieved FAR
- check_circleRoads and pavement plan
- radio_button_uncheckedElectricity supply plan
- check_circleWater supply plan
- check_circleSewerage and garbage disposal plan
- radio_button_uncheckedStorm water drainage
- radio_button_uncheckedStreet lighting plan
- check_circleParking plan
RERA documents
58 documents downloaded from the HRERA portal. Opens as PDF.
Plans & layouts
Licence & approvals
CA certificates
Declarations
Other documents
Hearings & orders
Proceedings recorded by the Authority on this registration.
Sh. Sumeet, Engineering Officer and Ms. Asha, Chartered Accountant briefed about the facts of the project. Ms. Anjana Gulati, Ms. Ekansh Mishra, Sh. Ranjit and Sh. Sumit Khatri are present on behalf of the promoter. A public notice regarding registration of project was issued in three newspapers dated 15.07.2025 against which no objections have been received in the Authority and none appeared in person before the Authority today i.e., 04.08.2025. The site of project has been inspected by the concerned official of the Authority and it is reported that the project site has access from 18 mt wide road only which is connected to Golf Course Road. The road is operational as on date yet road access permission has not been submitted by the promoter. As the road access permission has not been submitted, the promoter is directed to submit the status of 18 mt road with documentary proof i.e., either the road is revenue road or the promoter has obtained any access permission for the same. The promoter is also directed to submit the remaining deficit documents before next date of hearing. The matter to come up on 11.08.2025.
Development schedule
Planned spend each year, from the promoter's quarterly schedule.
Completion committed to RERA: 30 Sep 2032.