Ms. Prachi Singh, Planning Executive briefed about the facts of the project. Sh. Tarun Chadha (AR) and Sh. Vikash Singh (AR) are present on behalf of the promoter. Approved as proposed. The AR of the promoter states that the promoter company is the 100% owned subsidiary of M/s Godrej Properties Ltd. Further, a clarification has been obtained from HSVP dated 18.10.2024 that the service plan estimates are prepared and approved only for colonizer area and the same is not required for HSVP sectors/ auctioned site. Further the promoter has submitted BG of 25 lakh as a security amount for approval of SPE. In view of the above, the office is directed to refund the security amount deposited for SPE. The RC shall be issued after submission of corrected REP-I (A to H) and DPI.
- Home
- RERA Projects
- Gurugram
- Godrej Astra
GGM/883/615/2024/110
RERA overview
As filed by the promoter in Form REP-I with HRERA Gurugram.
- businessPromoter
- Wonder City Buildcon Ltd.
- placeLocation
- Sector 54, Urban Estate, Gurugram II
- mapTehsil / District
- Gurgaon, Gurugram
- verifiedRERA status
- Approved and certificate uploaded
- account_balanceAuthority
- HRERA Gurugram
- edit_calendarApplied on
- 24 Sep 2024
- architectureLayout plan approved
- 30 Aug 2024
- constructionConstruction start
- 16 Oct 2024
- event_availableCompletion date
- 16 Oct 2031
- workspace_premiumRegistration valid
- 08 Nov 2024 – 16 Oct 2031
- layersFAR (permissible / proposed)
- 3.65 / 3.64
- paymentsEstimated project cost
- ₹ 883.64 Cr
Licence
Land use 2.76 acres in all
Estimated cost ₹ 883.64 Cr in all
Promoter
- Company
- Wonder City Buildcon Ltd.
- Registered office
- Godrej One, 5th Floor, Pirojshanagar Eastern Express Highway, Vikhroli (East) Mumbai, Maharashtra – 400079
- CIN
- U70100MH2013PLC247696
Book a free site visit
Latest price, offers and a guided visit of Godrej Astra.
Mr Prashant Agarwal is available to discuss all your queries.
Online now · replies on WhatsApp
Quick questions
Plot sizes
1 sizes · 0 plots registered with RERA. Tap a column to sort.
| Sq yd | Sq ft | Sq m | Plots |
|---|---|---|---|
| 0 | 0 | 0 | 0 |
Areas are as registered with RERA (square metres); square yards and square feet are converted. Final sizes are as per the allotment.
Unit types
252 units in 1 types as registered with RERA.
| Type | Carpet area (sq ft) | Units |
|---|---|---|
| Apartment/Shops/Other Buildings | 62 – 2,030 | 252 |
Carpet areas as filed with RERA (square metres, shown in square feet). Booked / unsold are as on the RERA application date.
Facilities & services
11 facilities in the promoter's service plan estimate · ₹ 24.1 Cr budgeted.
-
add_road
Internal Roads and Pavements ₹ 2.45 Cr est.
-
water_drop
Water Supply System ₹ 2.34 Cr est.
-
water
Storm Water Drainage ₹ 64.16 L est.
-
bolt
Electricity Supply System ₹ 8.71 Cr est.
-
recycling
Sewage Treatment & Garbage Disposal ₹ 20.52 L est.
-
light
Street Lighting ₹ 48.85 L est.
-
local_fire_department
Security and Fire Fighting ₹ 4.65 Cr est.
-
nature
Softscape ₹ 1.21 Cr est.
-
nature
Hardscape ₹ 1.69 Cr est.
-
bolt
Electrical Sub Station ₹ 1.53 Cr est.
-
check_circle
Signages ₹ 17.7 L est.
Not in this filing Playgrounds and Parks Club House / Community Centre Shopping Area Renewable Energy System School Hospital / Dispensary
External connections
- radio_button_uncheckedRoads HSVP
- check_circleWater Supply HSVP
- check_circleElectricity DHBVN
- check_circleSewage Disposal HSVP
- check_circleStorm Water Drainage HSVP
Specifications
- Flooring Details of Various Parts of House
- VITRIFIED TILES/CERAMIC TILES
- Wall Finishing Details
- ACRYLIC EMULSION PAINT/ OIL BOUNDDISTEMPER
- Kitchen Details
- FLOOR: VITRIFIED TILES, WALL: CERAMIC TILES2FT ABOVE COUNTER AND OBD PAINT ONREMAINING AREA, CEILING: OBD PAINT
- Bathroom Fittings
- ALL PROVIDED WITH STANDARD COMPANY MAKE
- Wood Work Etc
- LAMINATED/PAINTED FLUSH DOORS/MOULDEDSHUTTER WITH WOODEN FRAME (PRE-HUNGLEVEL WITH LAMINATE)
- Doors and Windos Frames
- LAMINATED/PAINTED/POWER COATED FRAMESOF WOODEN/ALUMINIUM/UPVC MATERIAL
- Glass Work
- 4MM AND ABOVE AS PER SPECIFICATIONS
- Electric Fittings
- AS PER BUILDING NORMS
- Conducting and Wiring Details
- AS PER BUILDING NORMS
- Water Storage
- UNDER GROUND WATER TANK & OVERHEADWATER TANK
- Lift Details
- TOWER 1 & 2: 3 PASSENGER LIFT & 1 SERVICELIFT (EACH)
- Windows / Glazings
- POWDER COATED/PAINTED ALUMINUM/UPVCWINDOWS WITH 4MM OR ABOVE THICK GLAZINGAS PER SPECIFICATIONS
- Doors
- LAMINATED/PAINTED FLUSH DOORS/MOULDEDSHUTTER WITH WOODEN FRAME (PRE-HUNGLEVEL WITH LAMINATE)
- Main Doors
- VENEER/LAMINATED/PAINTED FLUSH/FIRE DOORWITH WOODEN FRAME
- Internal Doors
- LAMINATED/PAINTED FLUSH DOORS/MOULDEDSHUTTER WITH WOODEN FRAME (PRE-HUNGLEVEL WITH LAMINATE)
- Air Conditioning
- AS PER SPECIFICATION. OF STANDARD MAKE
- Electrical Fittings
- AS PER SPECIFICATION. OF STANDARD MAKE
- External Finishing / Colour Scheme
- EXTERNAL GRADE PAINTS
- Internal Finishing
- 10 TO 12MM THICK PLASTER ON BLOCKWORKSAND RCC WALLS AND COLUMNS WITH CEMENTMORTAR OF 1:5
- Floor
- VITRIFIED TILE
- Walls
- ACRYLIC EMULSION PAINT/ OIL BOUNDDISTEMPER PAINT
- Ceiling
- OIL BOUND DISTEMPER PAINT
- Floor
- LAMINATED WOODEN FLOORING
- Walls
- ACRYLIC EMULSION PAINT/ OIL BOUNDDISTEMPER PAINT
- Ceiling
- OIL BOUND DISTEMPER PAINT
- Floor
- ANTI-SKID CERAMIC TILES
- Walls
- CERAMIC TILES UPTO 7FT HEIGHT. OIL BOUNDDISTEMPER PAINT ON THE REMAINING AREA.
- Ceiling
- FALSE CEILING/GRID CEILING
- Counters
- GRANITE/STONE
- Sanitary Ware / Cp Fittings
- ALL PROVIDED OF STANDARD COMPANY MAKE
- Fitting / Fixtures
- ALL PROVIDED OF STANDARD COMPANY MAKE
- Floor
- LAMINATED WOODEN FLOORING
- Walls
- ACRYLIC EMULSION PAINT/ OIL BOUNDDISTEMPER PAINT
- Ceiling
- OIL BOUND DISTEMPER PAINT
- Floor
- ANTI-SKID CERAMIC TILES
- Walls
- ACRYLIC EMULSION PAINT/ OIL BOUNDDISTEMPER PAINT
- Ceiling
- OIL BOUND DISTEMPER PAINT
- Counters
- GRANITE/STONE
- Sanitary Ware / Cp Fittings
- ALL PROVIDED OF STANDARD COMPANY MAKE
- Fixtures
- ALL PROVIDED OF STANDARD COMPANY MAKE
- Floor
- VITRIFIED TILES
- Walls
- CERAMIC TILES 2FT ABOVE COUNTER AND OBDPAINT ON REMAINING AREA
- Ceiling
- OIL BOUND DISTEMPER PAINT
- Counters
- GRANITE/STONE
- Fixtures
- ALL PROVIDED OF STANDARD COMPANY MAKE
- Floor
- VITRIFIED TILES
- Walls & Ceiling
- OIL BOUND DISTEMPER PAINT
- Toilet
- ANTI-SKID CERAMIC TILES
- Balcony
- ANTI-SKID CERAMIC TILES
- Floor
- ANTI-SKID CERAMIC TILES
- Walls & Ceiling
- ACRYLIC EMULSION PAINT/ OIL BOUNDDISTEMPER PAINT
- Railings
- MS RAILINGS
- Fixtures
- ALL PROVIDED OF STANDARD COMPANY MAKE
Statutory approvals
Approvals declared in Form REP-I Part E.
- verified Letter of Intent (LOI) Obtained
- verified Allotment Letter Obtained
- verified Offer of Possession Obtained
- verified Possession Letter Obtained
- verified Assurance of Sewerage Connection Obtained
- verified Assurance of Storm Water Connection Obtained
- verified Assurance of STP Treated Water Connection for Construction Purpose Obtained
- verified Assurance of Water Supply Obtained
- verified Sanction of Ultimate Load Assurance Obtained
- verified Building Plan Approval Obtained
- verified Environment Clearance Obtained
Plans filed with RERA
- radio_button_uncheckedLayout plan
- radio_button_uncheckedDemarcation plan
- check_circleZoning plan
- check_circleBuilding plan
- check_circleSite plan
- check_circleFloor plan
- check_circleApartment plans
- check_circleElevation section
- check_circleDetail of permissible FAR
- check_circleDetail of covered area achieved FAR
- radio_button_uncheckedRoads and pavement plan
- radio_button_uncheckedElectricity supply plan
- radio_button_uncheckedWater supply plan
- radio_button_uncheckedSewerage and garbage disposal plan
- radio_button_uncheckedStorm water drainage
- radio_button_uncheckedStreet lighting plan
- radio_button_uncheckedParking plan
RERA documents
52 documents downloaded from the HRERA portal. Opens as PDF.
Plans & layouts
Licence & approvals
CA certificates
Other documents
Hearings & orders
Proceedings recorded by the Authority on this registration.
The matter is adjourned and to come up on 28.10.2024.
Development schedule
Planned spend each year, from the promoter's quarterly schedule.
Completion committed to RERA: 16 Oct 2031.